41.176 HzPaul Samuel Guarino
Benchmarked · 19/700,318 pending

Klein’s Pollution Solutions

Project Promised Land
Environmental monitoring · early warning

A deterministic five-layer detection engine for contamination and surveillance time series. It finds the point where a signal’s behaviour changes, in several cases well before the readings cross a regulatory action limit.

What it is

It reads a stream of measurements and says one thing: something changed here, investigate now. It does not diagnose, declare an emergency or set policy.

The five layers

LayerNameWatches for
1ViolationThe reading crossed the defined action limit
2SpikeA sharp statistical excursion above baseline
3WaveA slower wave building above baseline
4DisruptionThe signal’s rhythm losing phase lock: a change in structure, not magnitude
5CoherenceStrict confirmation of phase-lock and harmonic resonance together

Layers 2 to 5 work on readings below the action limit. They are the early-warning function. A parallel spatial engine separates a localised source from regional drift.

Flagship result: New Delhi PM2.5

Real recorded data

27,820 consecutive hourly records from one New Delhi station, the largest continuous series in the portfolio.

29 / 29
Severe pollution onsets warned
35 hours
Median lead time before onset
0
Missed onsets
91.1%
Fewer false alarms in Air Mode, with recall unchanged at 1.000

Air Mode uses a trailing 30-day baseline. It uses only data already seen, never future data.

Environmental contamination records

Real recorded data

Every one of these is real recorded regulatory or monitoring data.

DatasetContaminantMediumRecordsMissedFalse alarmsF1
Flint, Michigan lead crisisLeadDrinking water31001.000
Bethpage TCE plume, Long IslandTrichloroethyleneGroundwater6001.000
East Palestine derailment, OhioVinyl chlorideAir / soil33001.000
Daily asbestos exposure eventsAsbestosAir3,499001.000

Flint, Bethpage and East Palestine were re-run at eight sensitivity settings. F1 was 1.000 at every one.

Early warning without the threshold

Real recorded data

On the 2011 Yap Island dengue outbreak (185 daily observations, 978 real reported cases), with the action-limit layer switched off entirely, the remaining layers first flagged the epidemic 70 days before its peak, at 7 cumulative cases. With the threshold layer on, the flag comes 85 days before peak.

On the Texas coast, the spatial engine was given 4,254 GPS-tagged beach surveys of plastic pellets with no labels and no tuning. It singled out the Galveston Bay / Houston Ship Channel stretch as the localised source.

Across the whole portfolio

Real data and synthetic data are kept apart and labelled, in the benchmark report and here.

Kind of dataTestsRecordsMissed events
Real recorded data145,5460
Synthetic stress series811,2000

Every result shown above on this page is from real recorded data.

Instrument v5.0, locked 9 September 2026. Covered by U.S. Non-Provisional Patent Application 19/700,318, pending.

Read more

Licensing & collaboration

Offered for licensing, not for sale. Independent validation, engineering collaboration and research partnerships are welcome.

[email protected]

Inventor: Paul Samuel Guarino, Independent Researcher & Inventor